Saturday, November 20, 2010

More from 12th November


Here we go... more views from in and around the place...

First up is one taken as a mistake, but in a strange way I quite like it!
Its a view into the Children's centre - at the far end is what will be the toilet!
















I've asked Fred if there are stairs that come down as it seems these stairs only go up!
The Youth pod takes shape too



In this photo, you can see the size of the new balcony. It is taken from the top of the stairs and all the floor you can see will be the balcony outside room 1 of The Link Conference Rooms.
This will be ideal in itself as a meeting place or a space for a breakout group. (Its also where the vending machine will be!)
The orange doorway on the right is the door directly into Room 1. Just out of shot (immediately to right of where I'm standing) is the main door into the conference rooms

From the balcony this view is upwards towards the roof of the Link above the bridge and the main entrance.
With these windows and another even bigger one out of shot to the left, it is certainly bright up there!
 With all the building work going on, we have taken the opportunity to update other bits of the premises too. In the hall 2 fans like this one have been installed in the ceiling. These will be excellent in the winter and summer to push heat down or take heat away...

We have also had new efficient and quiet wall heaters fitted... the hall will be usable and warm (or cool)
Lots is going on outside too. The large extraction / ventilation unit has been lifted onto the flat roof.

Also possible here to see some of the windows going into the foyer.

Its slowly coming together...

No comments:

Post a Comment